WSN series gas / oil fired industrial horizontal steam boiler is a kind of safety and high efficiency heating equipment with fully automatic intelligent control system. It’s a boiler shell type 3 passes wetback oil/gas fired boiler. Usually, the WNS series steam boilers widely used for industry production and processing, such as textile mill, medicine industry, food & beverage industry, chemical industry, garment industry, food processing industry, and wood processing industry, moreover, it could be used for central heating in enterprise, hotel, hospital, civil architecture, etc.
(B) A boiler which is subject to inspection shall be prepared for inspection by the owner or user of the boiler when notified by the inspector in accordance with this rule. (C) The owner or user shall prepare a boiler for internal inspection in the following manner, as applicable: (1) Shut down and cool the boiler
2017-8-23 · Internal Inspection Preparation for an internal inspection is more involved since the boiler must be shut down and opened. The following outline provides guidance on preparing your boiler for an internal inspection. Details will, of course, vary depending on the specific jurisdictional requirements and type of boiler being inspected.
2005-4-11 · Prepare boiler for internal inspection in the following manner: a. Fuel supply and ignition system shall be locked out. b. Water shall be drawn off and water side thoroughly washed out. c. Manhole and handhole plates, washout plugs, inspection plugs in water column connections shall be removed. d. The boiler shall be cooled and thoroughly cleaned.
2019-8-23 · Internal inspections are done when the boiler is not in service and are a lot more complex, which is why HSB created a list outlining how to prepare for an inspection. Make sure that you prepare for the inspection correctly because if not, the Boiler Inspector can refuse the inspection until the boiler is properly prepared.
Inspection of Pressure-Retaining Items, in the paragraph entitled, "Internal Inspection" of the National Board Inspection Code. Boiler inspectors have the authority to order that boiler metal samples and/or ultrasonic tests be taken for their examination to ascertain the actual condition of the pressure parts.
2019-3-13 · RULES AND REGULATIONS FOR BOILER AND PRESSURE VESSEL INSPECTION (R.I.G.L. - 28-25) When a boiler and pressure vessel inspection law is enacted in a jurisdiction, the enforcement authority may be (internal or external) or design temperature of a
2019-9-13 · The Department will notify the boiler owner or operator verbally or in writing of the need for an internal inspection. Owners or users must prepare a boiler or unfired pressure vessel for internal inspection in accordance with the ANSI/NB23 after an inspector provides notification. Inspectors will not inspect a boiler or unfired pressure vessel
2014-8-20 · 14 Steps to Prepare Your Boiler for Winter TIP SHEET: SUMMARY Routine maintenance is neces-sary to avoid boiler downtime and unnecessary expenses. On a regular basis, visually inspect all parts of the boiler system, analyze combustion and test the boiler feedwater.
2018-10-5 · INSERVICE INSPECTION An inspection completed while the boiler is in operation. Owner shall prepare boiler free of leaks for inspection and demonstrate proper function and safe operation per S2.7.1. INTERNAL / VISUAL INSPECTION The owner/user shall prepare the boiler for an internal / visual inspection per S2.5.2. 1.
2016-2-26 · (ASME) 2010 edition and 2011a addenda Boiler and Pressure Vessel codes for the construction and installation of boilers and The National Board of Boiler and Pressure Vessel Inspectors (NBBI) Inspection Code (NBIC) for inspection, installation, and repair of boilers.
In this article we will discuss the need for Marine Boiler inspection, because boiler on board the ship is important and sensitive equipment. So, it has to be frequently inspected for proper and efficient operation. Planning for the inspection is also important duty carried out before inspection. Once plan is made and tools are kept ready the boiler which is firing has to be Shutting Down.
Model | Rated steam capacity(t/h) | Rated working pressure(Mpa) | Rated steam temperature(℃) | Maximum transport size(m) (L×W×H) |
WNS1-0.7-Y(Q) | 1 | 0.7 | 170 | 3.3×1.8×2.1 |
WNS1-1.0-Y(Q) | 1 | 1 | 184 | 3.3×1.8×2.1 |
WNS1.5-1.0-Y(Q) | 1.5 | 1 | 184 | 3.0×1.8×2.0 |
WNS1.5-1.25-Y(Q) | 1.5 | 1.25 | 194 | 3.0×1.8×2.0 |
WNS2-1.0-Y(Q) | 2 | 1 | 184 | 4.4×2.1×2.5 |
WNS2-1.25-Y(Q) | 2 | 1.25 | 194 | 4.4×2.1×2.5 |
WNS3-1.0-Y(Q) | 3 | 1 | 184 | 4.6×2.3×2.6 |
WNS3-1.25-Y(Q) | 3 | 1.25 | 194 | 4.6×2.3×2.6 |
WNS4-1.25-Y(Q) | 4 | 1.25 | 194 | 4.7×2.5×2.9 |
WNS4-1.6-Y(Q) | 4 | 1.6 | 204 | 4.7×2.5×2.9 |
WNS5-1.25-Y(Q) | 5 | 1.25 | 194 | 5.3×2.7×3.3 |
WNS5-1.6-Y(Q) | 5 | 1.6 | 204 | 5.3×2.7×3.3 |
WNS6-1.25-Y(Q) | 6 | 1.25 | 194 | 5.9×2.6×3.0 |
WNS6-1.6-Y(Q) | 6 | 1.6 | 204 | 5.9×2.6×3.0 |
WNS8-1.25-Y(Q) | 8 | 1.25 | 194 | 5.9×2.8×3.1 |
WNS8-1.6-Y(Q) | 8 | 1.6 | 204 | 5.9×2.8×3.1 |
WNS10-1.25-Y(Q) | 10 | 1.25 | 194 | 7.7×2.8×3.1 |
WNS10-1.6-Y(Q) | 10 | 1.6 | 204 | 7.7×2.8×3.1 |
WNS15-1.25-Y(Q) | 15 | 1.25 | 194 | 7.0×3.1×3.6 |
WNS15-1.6-Y(Q) | 15 | 1.6 | 204 | 7.0×3.1×3.6 |
WNS20-1.25-Y(Q) | 20 | 1.25 | 194 | 8.3×3.4×4.0 |
WNS20-1.6-Y(Q) | 20 | 1.6 | 204 | 8.3×3.4×4.0 |